Suleja Dam and Water Supply Project, Niger State
In 1991, the Niger State Government of Nigeria embarked on the Suleja Dam and Water Supply project, aimed at ensuring sustainable water resources for the Suleja area. With a total project cost of $64 million USD, funded by the African Development Bank, this initiative marked a significant milestone in regional development.
PSE Consultants Limited led the design and construction supervision, while Impresit Bakolori handled the construction. The dam is a 20-metre-high homogenous earth structure, stretching 1,200 metres in length. The reservoir covers an area of 5 square kilometres and holds approximately 30 million cubic metres of water.
Key Features
The Curved Spillway — a 105-metre curved spillway designed for increased discharge capacity, space efficiency, and energy dissipation. Intake Tower and Tunnel — connected to the other side of the dam via a 125-metre tunnel, housing adjustable valves to regulate downstream release for domestic and agricultural needs.
Impact
The project significantly enhanced water availability in the region, supporting local agriculture and improving living conditions.
Location
Suleja, Niger State
Project cost
$64 million USD
Funding
African Development Bank
Completed
1991
Dam height
20 metres
Dam length
1,200 metres
Reservoir
5 km² — approx. 30 million m³
Contractor
Impresit Bakolori
Suleja Dam — Project Footage